Water Shed


Intervention

  • Two watersheds covering 8 villages in Rangareddy district
  • Year of implementation – 2010-2015 covered area 3300ha
  • Total households 940
  • Executed& provided technical assistance for
  • construction of Percolation tanks -06,Mini
  • percolation Structures,24, Sunken ponds 174,
  • 34,Checkwalls -04, Check dams-08, Vermi
  • compost units 21.
  • Water absorption Trenches – 3580Cumt
  • Farm Bunds -14258 Cum –Total Farm Bunding and other in -17838Cum
  • Bund Plantation – 256800
  • Avenue plantation- 10kilometers

Achievements

  • The total area of 2800ha, generated 123250
  • employment days in two watersheds for 5 years
  • Due to stone works in the gullies and drainage
  • the run off reduced and soil deposited
  • 260 ha brought under cultivation
  • 102300 forest species raised on bund
  • 280 farmers benefitted
  • Cropping pattern changed to– Vegetables, Maize (sweet corn), pulses, horticulture.
  • Yield improved an extra 2 to 3 quintals
  • Erosion arrested soil depth 7ft improved.
  • Bore well Water recharge one meter
  • Two crops per year
  • 50 ha silt application.
  • Revived Organic manure in vegetable farms
  • 30 Vermi compost units
  • Introduced Horticulture an area of 30 ha units, along with drip
  • Priority to vulnerable women, and POP families,
  • 60 landless families created sustainable livelihoods
  • Rs. 60.70 lakhs revolving fund
  • Convergence with Agriculture, AH, KVK, Drip, Research Inst, ATMA, Forest dept, NREGS
All Rights Reserved, Copyright 2022, SEED
Powered by :